ZHENG Lin ao,WU Di,ZHANG Jing jing,et al.Practice of River Ecological Replenishment Retrofitting from an Urban Sewage Pumping Station[J].China Water & Wastewater,2018,34(20):82-86.
城市污水泵站改為河道生態(tài)補(bǔ)給站的實(shí)踐總結(jié)
- Title:
- Practice of River Ecological Replenishment Retrofitting from an Urban Sewage Pumping Station
- 文章編號(hào):
- 1000-4602(2018)20-0082-05
- 關(guān)鍵詞:
- 污水泵站; 河道補(bǔ)給; 移動(dòng)床生物膜反應(yīng)器; 全地下; 分散處理
- 分類(lèi)號(hào):
- TU99
- 文獻(xiàn)標(biāo)志碼:
- C
- 摘要:
- 綜合考慮污水廠(chǎng)擴(kuò)容、管網(wǎng)擴(kuò)建及河道生態(tài)補(bǔ)給,采用分散型污水處理理念,將城市污水泵站改造為河道生態(tài)補(bǔ)給站,就地處理就近補(bǔ)給河道。生態(tài)補(bǔ)給站設(shè)計(jì)規(guī)模為6 000 m3/d,采用集約化、地埋式設(shè)計(jì),選用A2O+MBBR、矩形沉淀池、混凝沉淀池、轉(zhuǎn)盤(pán)濾池、活性炭過(guò)濾等先進(jìn)工藝,實(shí)際出水COD、BOD5、SS、氨氮、TN、TP均值分別為20.5、3.95、5.7、0.46、12.1、0.16 mg/L,各指標(biāo)達(dá)到準(zhǔn)地表Ⅳ類(lèi)標(biāo)準(zhǔn)。本項(xiàng)目的實(shí)施為城市中心區(qū)污水處理設(shè)施建設(shè)及區(qū)域水環(huán)境綜合治理提供了新思路和設(shè)計(jì)借鑒。
Abstract:- Considering the expansion of the wastewater treatment plant, extension of the pipeline network and ecological replenishment of the river, the concept of decentralized sewage treatment was adopted. A river ecological replenishment station (RERS) was established in the middle section of the main pipeline of the city so that its effluent could be used for river replenishing nearby. Based on the concepts of intensiveness and buried design, the process including A2O and MBBR, rectangular settling tanks, coagulation settlement tank, rotary filter and active carbon filtration was selected, with the design capacity of 6 000 m3/d. The average effluent COD, BOD5, SS, NH3-N, TN, TP were 20.5 mg/L, 3.95 mg/L, 5.7 mg/L, 0.46 mg/L, 12.1 mg/L, 0.16 mg/L, respectively, which could basically meet level Ⅳ of Environmental Quality Standards for Surface Water(GB 3838-2002). The implementation of this project provides a new idea and design reference for the construction of urban wastewater treatment facilities and comprehensive treatment of regional water environment.
參考文獻(xiàn)/References:
[1]徐志嬙,魏紅,黃廷林. 污水采用集中或分散處理再生回用的經(jīng)濟(jì)比較[J]. 中國(guó)給水排水,2007,23(6):79-83.Xu Zhiqiang,Wei Hong,Huang Tinglin. Economic comparison of centralized and decentralized wastewater reclamation and reuse systems[J]. China Water & Wastewater,2007,23(6):79-83(in Chinese).
[2]王翥田,葉亮,張新彥,等. MBBR工藝用于無(wú)錫蘆村污水處理廠(chǎng)的升級(jí)改造[J]. 中國(guó)給水排水,2010,26(2):71-73.Wang Zhutian,Ye Liang,Zhang Xinyan,et al. Application of MBBR process to upgrading and reconstruction of WWTP[J]. China Water & Wastewater,2010,26(2):71-73(in Chinese).
[3]楊學(xué)貴,肖曉文,孫雁,等. 昆明第四水質(zhì)凈化廠(chǎng)MBR工藝7年運(yùn)行實(shí)踐分析[J]. 中國(guó)給水排水,2017,33(14):121-127.Yang Xuegui,Xiao Xiaowen,Sun Yan,et al. Analysis of MBR of 7 years practical operation in the Fourth Wastewater Purification Plant of Kunming[J]. China Water & Wastewater,2017,33(14):121-127(in Chinese).
[4]龔希博,李翠梅,陳長(zhǎng)林,等. 高密度沉淀池/轉(zhuǎn)盤(pán)濾池用于污水廠(chǎng)的提標(biāo)改造[J]. 中國(guó)給水排水,2014,30(23):61-64.Gong Xibo,Li Cuimei,Chen Changlin,et al. Application of Densadeg and rotary filter to upgrading and reconstruction of wastewater treatment plant[J]. China Water & Wastewater,2014,30(23):61-64(in Chinese).
[5]孫喜鵬,江奇志,李強(qiáng). 疊螺脫水機(jī)與離心脫水機(jī)在污泥處理中的應(yīng)用比較[J]. 工業(yè)用水與廢水,2012,43(6):73-76.Sun Xipeng,Jiang Qizhi,Li Qiang. Comparison between fold screw dewatering machine and centrifugal dehydrator applied for oily sludge treatment[J]. Industrial Water & Wastewater,2012,43(6):73-76(in Chinese).
備注/Memo
通信作者:吳迪E-mail:hitwudi@126.com作者簡(jiǎn)介:鄭臨奧(1992-),男,山東淄博人,碩士,主要從事水處理工藝設(shè)計(jì)與調(diào)試運(yùn)行工作。
E-mail:hitwudi@126.com
收稿日期:2018-06-25