ZENGMing,GUOQing-he,XUGui?da,et al.Reconstruction and Operation Analysis of WWTP in a Chemical Industry Park[J].China Water & Wastewater,2022,38(18):101-106.
化工園區(qū)綜合污水廠的工程改造及運(yùn)行分析
- Title:
- Reconstruction and Operation Analysis of WWTP in a Chemical Industry Park
- Keywords:
- chemical industry park; micro-electrolysis; Fenton; ozone catalytic oxidation; upgrading and reconstruction
摘要:- 某以醫(yī)藥中間體、農(nóng)藥中間體、石化產(chǎn)業(yè)為主的化工園區(qū)綜合污水處理廠原采用Biodopp生化/高效沉淀池/纖維轉(zhuǎn)盤濾池工藝,設(shè)計(jì)處理規(guī)模為5 000 m3/d,出水指標(biāo)僅BOD5、SS和TP能達(dá)到《城鎮(zhèn)污水處理廠污染物排放標(biāo)準(zhǔn)》(GB 18918—2002)的一級(jí)A標(biāo)準(zhǔn)。針對(duì)此問(wèn)題,采用微電解+芬頓+A2/O+MBBR+臭氧催化氧化+BAF工藝進(jìn)行了工程改造,在保持處理規(guī)模不變的情況下,當(dāng)進(jìn)水COD、BOD5、SS、NH3-N、TN、TP、Cl-平均濃度分別為263.8、16.7、107.2、12.22、42.36、4.8、3 998.16 mg/L時(shí),處理出水COD、氨氮、總氮的平均濃度分別為29.17、0.16、7.86 mg/L,去除率分別達(dá)到89.11%、98.63%、81.44%,實(shí)際出水水質(zhì)優(yōu)于一級(jí)A排放標(biāo)準(zhǔn),滿足污水處理廠的廢水排放標(biāo)準(zhǔn),總處理費(fèi)用為4.77元/m3。
Abstract:- The original process of the comprehensive wastewater treatment plant (WWTP) of a chemical industrial park focusing on pharmaceutical intermediates, pesticide intermediates and petrochemical industry, is Biodopp biochemical, high efficiency sedimentation tank, and fiber rotary table filter, with a design capability of 5 000 m3/d. Only BOD5, SS and TP indexes can meet the requirements of the first level A criteria specified in Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). In order to solve this problem, the process of micro-electrolysis, Fenton, A2/O, MBBR, ozone catalytic oxidation, and BAF was used for reconstruction. With the original treatment capability unchanged, when the average concentrations of influent COD, BOD5, SS, NH3-N, TN, TP and Cl- are 263.8 mg/L, 16.7 mg/L,107.2 mg/L, 12.22 mg/L, 42.36 mg/L, 4.8 mg/L, 3 998.16 mg/L, respectively, the average concentrations of effluent COD, ammonia nitrogen and total nitrogen are 29.17 mg/L, 0.16 mg/L and 7.86 mg/L, and their removal rates can reach 89.11%, 98.63% and 81.44%, respectively. The effluent water quality is superior to the requirements of the first level A discharge standard, and the total cost of wastewater treatment is 4.77 yuan/m3.
相似文獻(xiàn)/References:
[1]潘名賓,潘維龍,陳燕波,等.某大型綜合化工園區(qū)污水處理廠分質(zhì)提標(biāo)工程設(shè)計(jì)[J].中國(guó)給水排水,2021,37(18):70.
PAN Ming-bin,PAN Wei-long,CHEN Yan-bo,et al.Design of Separate Upgrading Project of a Wastewater Treatment Plant in a Large Comprehensive Chemical Park[J].China Water & Wastewater,2021,37(18):70.
[2]曾慧卿,古志豪,王白楊,等.抗生素生產(chǎn)廢水處理工程實(shí)例[J].中國(guó)給水排水,2022,38(6):99.
ZENG Hui-qing,GUZhi-hao,WANG Bai-yang,et al.Case Study of an Antibiotic Wastewater Treatment Project[J].China Water & Wastewater,2022,38(18):99.
[3]馮洪波,潘增銳,盛建龍,等.利用廢棄鐵刨花去除污水中的磷[J].中國(guó)給水排水,2022,38(7):86.
FENGHong-bo,PANZeng-rui,SHENGJian-long,et al.Reuse of Waste Iron Shavings for Phosphorus Removal from Sewage[J].China Water & Wastewater,2022,38(18):86.
[4]賈莉,傅妍芳,龔淑芬.化工園區(qū)污水處理一級(jí)A提標(biāo)改造工藝及運(yùn)行分析[J].中國(guó)給水排水,2022,38(20):124.
JIALi,FUYan-fang,GONGShu-fen.Analysis on First Level A Criteria Upgrading Process and Operation of Wastewater Treatment in a Chemical Industrial Park[J].China Water & Wastewater,2022,38(18):124.
[5]胡邦,楊艷坤,張?chǎng)?等.化工園區(qū)工業(yè)污水“分類分質(zhì)”處理工藝系統(tǒng)設(shè)計(jì)[J].中國(guó)給水排水,2023,39(6):66.
HUBang,YANGYan-kun,ZHANGXin,et al.Design of Industrial Wastewater Treatment System in Chemical Industrial Park Based on Classification and Quality[J].China Water & Wastewater,2023,39(18):66.