TIANHai-cheng,YANGHong-hong,JIAOWen-hai,et al.Key Points for Each Section Design of AAO and MBR Combined Process[J].China Water & Wastewater,2023,39(6):71-77.
AAO+MBR組合工藝各工段設(shè)計要點
- Title:
- Key Points for Each Section Design of AAO and MBR Combined Process
- Keywords:
- AAO; MBR; key points of design
摘要:- 隨著各地污水處理廠排放標(biāo)準(zhǔn)的日趨嚴(yán)格,工藝流程短、出水效果好的AAO+MBR組合工藝得以快速普及,尤其對于用地面積緊張、
景觀環(huán)境要求高的地下式污水處理廠,其更受青睞。然而AAO+MBR組合工藝并非是傳統(tǒng)AAO和新型膜技術(shù)的簡單疊加,其預(yù)處理、AAO、MBR等單元的設(shè)計與傳統(tǒng)AAO均存在明顯區(qū)別。結(jié)合國內(nèi)眾多工程案例,詳細(xì)分析了AAO+MBR組合工藝的設(shè)計要點,如預(yù)處理工段需根據(jù)進(jìn)水水質(zhì)選擇設(shè)置初沉池,同時應(yīng)設(shè)置膜格柵以避免纖維、毛發(fā)等造成膜絲纏繞;AAO工段的特殊性在于三級回流比的確定、AAO各區(qū)設(shè)計污泥濃度的計算、AAO+MBR各區(qū)實際流量的計算、需氧量的計算以及強(qiáng)化脫氮措施的設(shè)計等;MBR工段的特殊性在于膜通量計算、膜區(qū)設(shè)計污泥濃度的確定、產(chǎn)水泵流量和揚(yáng)程的計算、膜區(qū)底部吹掃設(shè)計以及膜清洗設(shè)計等。
Abstract:- With the increasingly stringent discharge standards of sewage treatment plants in China, the AAO and MBR combined process with short process flow and good effluent quality has been rapidly popularized, especially for underground sewage treatment plants with limited footprint area and high landscape environment requirements. However, the combined process is not a simple superposition of traditional AAO and new membrane technology, and the design of pretreatment, AAO, MBR and other units are obviously different from that of traditional AAO. Based on many domestic engineering cases, this paper analyzed the design points of AAO and MBR combined process in detail. For example, a primary sedimentation tank should be set according to the influent quality in the pretreatment section, and an ultrafine screen should be set to avoid the filament entanglement caused by fiber and hair. The particularity of AAO section lay in the determination of the three-stage reflux ratio, the calculation of the designed sludge concentration in each AAO section, the calculation of the actual flow of each section of AAO/MBR, the calculation of oxygen demand and the design of enhanced denitrification measures. The particularity of MBR section lay in the calculation of membrane flux, the determination of designed sludge concentration in membrane area, the calculation of pump flow and head, the design of the membrane air souring structure at the bottom of membrane area and the design of membrane cleaning method.
相似文獻(xiàn)/References:
[1]周傳庭,謝勇,安瑩,等.竹園第二污水處理廠提標(biāo)改造工程設(shè)計[J].中國給水排水,2021,37(16):73.
ZHOU Chuan-ting,XIE Yong,AN Ying,et al.Design of Upgrading and Reconstruction Project of Zhuyuan No.2 Wastewater Treatment Plant[J].China Water & Wastewater,2021,37(6):73.
[2]毛宇洛,石文鵬.江西某廠網(wǎng)一體化項目污水廠調(diào)試運(yùn)行實例[J].中國給水排水,2022,38(4):12.
MAO Yu-luo,SHI Wen-peng.A Practical Example of Commissioning and Operation of a Wastewater Treatment Plant in a Plant?Network Integration Project in Jiangxi[J].China Water & Wastewater,2022,38(6):12.
[3]李一龍,包宇,邸文正,等.高排放標(biāo)準(zhǔn)下分段進(jìn)水多級AO+MBR工藝的設(shè)計[J].中國給水排水,2022,38(4):76.
LIYi-long,BAOYu,DIWen-zheng,et al.Design of Step-feed Multi-stage AO+MBR Process under High Discharge Standard[J].China Water & Wastewater,2022,38(6):76.
[4]李志超,肖寧,林蔓,等.MBBR耦合MBR用于東北某低溫高排放標(biāo)準(zhǔn)污水廠[J].中國給水排水,2022,38(14):77.
LIZhi-chao,XIAONing,LINMan,et al.Application of MBBR Coupled with MBR Process in a Stringent Discharge Standard Wastewater Treatment Plant in Northeast China at Low Temperature[J].China Water & Wastewater,2022,38(6):77.
[5]黃珠慧,朱艷臣,王久龍,等.混凝+兩級A/O+MBR工藝處理糞便濾后液[J].中國給水排水,2022,38(24):115.
HUANGZhu-hui,ZHUYan-chen,WANGJiu-long,et al.Treatment of Fecal Filtrate by a Combined Process of Coagulation, Two-stage A/O and MBR[J].China Water & Wastewater,2022,38(6):115.
[6]王鳳雪,張新波,尚禹彤,等.MBBR—MBR對磺胺嘧啶的去除及膜污染特性[J].中國給水排水,2023,39(1):80.
WANGFeng-xue,ZHANGXin-bo,SHANGYu-tong,et al.MBBR-MBR System for Removal of Sulfadiazine and Its Membrane Fouling Characteristics[J].China Water & Wastewater,2023,39(6):80.
[7]劉浩,臧海龍,耿安鋒,等.青島李村河污水處理廠類Ⅳ類標(biāo)準(zhǔn)提標(biāo)擴(kuò)建工程設(shè)計[J].中國給水排水,2023,39(2):52.
LIUHao,ZANGHai-long,GENGAn-feng,et al.Design of Quasi Class Ⅳ Discharge Standard Upgrading and Expansion Project in Qingdao Licunhe Wastewater Treatment Plant[J].China Water & Wastewater,2023,39(6):52.