HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(22):66-70.
MBR工藝在神定河污水處理廠升級改造工程中的應用
- Title:
- Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant
- 文章編號:
- 1000-4602(2018)22-0066-05
分類號:- TU992.3
- 文獻標志碼:
- C
- 摘要:
- 十堰神定河污水處理廠升級改造工程設計總規(guī)模為18×104 m3/d,其中一期工程仍沿用A/O+二沉池工藝,設計規(guī)模由原5.5×104 m3/d降負荷調整為4×104 m3/d,出水水質需達到一級B排放標準; 二期工程采用AAO+MBR工藝,設計規(guī)模由原11×104 m3/d擴容到14×104 m3/d,出水水質執(zhí)行一級A排放標準。兩期工程的混合出水水質需達到一級A排放標準。投產運行后,出水水質優(yōu)于設計標準。
Abstract:- The design treatment capacity of the upgrading and reconstruction project of Shending River Wastewater Treatment Plant was 18×104 m3/d. In the first-stage project, A/O+ secondary sedimentation tank process was adopted and the treatment capacity was reduced from 5.5×104 m3/d to 4×104 m3/d. The effluent quality of the first-stage project was required to be better than the first class B discharge standard. The design capacity of second-stage project was increased from 11×104 m3/d to 14×104 m3/d, and AAO+MBR process was adopted as the treatment technology. The effluent quality of the second-stage project should meet the first class A discharge standard. The mixed effluent of the two projects should reach the first class A discharge standard. In the period of operation, the effluent quality was proven to be better than design discharge standard.
MBR工藝在神定河污水處理廠升級改造工程中的應用 侯曉慶, 鄧 磊, 高海英, 曹明浩, 吳念鵬, 牛和昕(北京碧水源科技股份)
王領全中國給水排水2021-12-27
MBR工藝在神定河污水處理廠升級改造工程中的應用
侯曉慶, 鄧 磊, 高海英, 曹明浩, 吳念鵬, 牛和昕
(北京碧水源科技股份有限公司, 北京 102206)
摘要:十堰神定河污水處理廠升級改造工程設計總規(guī)模為18×104 m3/d,其中一期工程仍沿用A/O+二沉池工藝,設計規(guī)模由原5.5×104 m3/d降負降調整為4×104 m3/d,出水水質需達到一級B排放標準; 二期工程采用AAO+MBR工藝,設計規(guī)模由原11×104 m3/d擴容到14×104 m3/d,出水水質執(zhí)行一級A排放標準。兩期工程的混合出水水質需達到一級A排放標準。投產運行后,出水水質優(yōu)于設計標準。
The design treatment capacity of the upgrading and reconstruction project of Shending River Wastewater Treatment Plant was 18×104 m3/d. In the first-stage project, A/O+ secondary sedimentation tank process was adopted and the treatment capacity was reduced from 5.5×104 m3/d to 4×104 m3/d. The effluent quality of the first-stage project was required to be better than the first class B discharge standard. The design capacity of second-stage project was increased from 11×104 m3/d to 14×104 m3/d, and AAO+MBR process was adopted as the treatment technology. The effluent quality of the second-stage project should meet the first class A discharge standard. The mixed effluent of the two projects should reach the first class A discharge standard. In the period of operation, the effluent quality was proven to be better than design discharge standard.[1]侯曉慶,鄧 磊,高海英,等.MBR工藝在神定河污水處理廠升級改造工程中的應用[J].中國給水排水,2018,34(22):66-70.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(22):66-70.
參考文獻/References:

MBR工藝在神定河污水處理廠升級改造工程中的應用
侯曉慶, 鄧 磊, 高海英, 曹明浩, 吳念鵬, 牛和昕
(北京碧水源科技股份有限公司, 北京 102206)
摘要:十堰神定河污水處理廠升級改造工程設計總規(guī)模為18×104 m3/d,其中一期工程仍沿用A/O+二沉池工藝,設計規(guī)模由原5.5×104 m3/d降負降調整為4×104 m3/d,出水水質需達到一級B排放標準; 二期工程采用AAO+MBR工藝,設計規(guī)模由原11×104 m3/d擴容到14×104 m3/d,出水水質執(zhí)行一級A排放標準。兩期工程的混合出水水質需達到一級A排放標準。投產運行后,出水水質優(yōu)于設計標準。
The design treatment capacity of the upgrading and reconstruction project of Shending River Wastewater Treatment Plant was 18×104 m3/d. In the first-stage project, A/O+ secondary sedimentation tank process was adopted and the treatment capacity was reduced from 5.5×104 m3/d to 4×104 m3/d. The effluent quality of the first-stage project was required to be better than the first class B discharge standard. The design capacity of second-stage project was increased from 11×104 m3/d to 14×104 m3/d, and AAO+MBR process was adopted as the treatment technology. The effluent quality of the second-stage project should meet the first class A discharge standard. The mixed effluent of the two projects should reach the first class A discharge standard. In the period of operation, the effluent quality was proven to be better than design discharge standard.[1]侯曉慶,鄧 磊,高海英,等.MBR工藝在神定河污水處理廠升級改造工程中的應用[J].中國給水排水,2018,34(22):66-70.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(22):66-70.
[1] 吳媛媛,張彩云,曹明浩,等. 神定河污水處理廠提標改造——CAS-MBR復合工藝[J]. 凈水技術,2016,35(4):11-15,87. Wu Yuanyuan,Zhang Caiyun,Cao Minghao,et al. Upgrading and reconstruction of Shendinghe WWTP in application of combined process of CAS-MBR[J]. Water Purification Technology,2016,35(4):11-15,87(in Chinese).
相似文獻/References:
[1]王 亮.馬來西亞Pantai地埋式污水廠環(huán)網供配電結構設計[J].中國給水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(22):63.
[2]邱明海.北京市垡頭污水處理廠改擴建工程設計技術方案[J].中國給水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(22):13.
[3]郝二成,郭毅,劉偉巖,等.基于數(shù)學模擬的污水廠運行分析——建模與體檢[J].中國給水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(22):23.
[4]張月,王陽,張宏偉,等.陽泉市污水處理二期工程BARDENPHO工藝設計和運行[J].中國給水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(22):64.
[5]祝新軍,蔡芝斌,姚斌,等.紹興污水處理廠氣浮設備的優(yōu)化改造[J].中國給水排水,2020,36(16):101.
ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(22):101.
[6]王文明,楊淇椋,蔡依廷,等.MSBR工藝在高排放標準污水處理廠的應用[J].中國給水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(22):111.
[7]郝二成,郭毅,劉偉巖,等.基于數(shù)學模擬的污水廠運行分析——控制與優(yōu)化[J].中國給水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(22):23.
[8]王陽,張月,王曉康,等.高排放標準下的改良AAO+深度處理工程案例[J].中國給水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(22):56.
[9]鄭楓,慕楊,孫遜.MBR工藝用于山東省某污水處理廠擴建工程[J].中國給水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(22):81.
[10]張莉,余國富,瞿露,等.重慶市某污水處理廠一級A提標改造運行效果分析[J].中國給水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(22):95.
備注/Memo
作者簡介:侯曉慶(1981- ), 女, 陜西三原人, 本科, 工程師, 主要從事膜工藝設計等相關工作。 E-mail:houxiaoqing@originwater.com
收稿日期:2018-05-04
近期發(fā)表