XIE Ming,YANG Zhi,ZHOU Yang-jun,et al.Sponge City Design Scheme of Road Reconstruction in Shanghai Lingang New-city District[J].China Water & Wastewater,2020,36(20):137-142.
上海臨港新城道路改造海綿城市設(shè)計方案
- Title:
- Sponge City Design Scheme of Road Reconstruction in Shanghai Lingang New-city District
- Keywords:
- road reconstruction; sponge city; biological retention zone; permeable pavement; total runoff control
- 摘要:
- 以上海海綿城市建設(shè)的試點(diǎn)區(qū)臨港新城內(nèi)某城市道路改造為研究對象,介紹了城市道路海綿城市建設(shè)過程中匯水分區(qū)劃分、雨水排水組織、海綿設(shè)施調(diào)蓄量計算、生物滯留帶、透水鋪裝以及附屬設(shè)施的設(shè)計方法。改造道路按照65%年徑流總量控制率進(jìn)行設(shè)計,并對項(xiàng)目建成后實(shí)際運(yùn)行效果進(jìn)行監(jiān)測,結(jié)果表明實(shí)際徑流總量控制率達(dá)96.3%,徑流污染物削減率達(dá)79%,設(shè)計方案滿足海綿城市控制目標(biāo)要求,可為同類項(xiàng)目提供參考。
- Abstract:
- Taking the road reconstruction of Lingang new-city district in Shanghai, the pilot area of sponge city construction as the research object, we introduced the design methods of catchment division, rainwater drainage organization, sponge facility regulation and storage capacity calculation, biological retention zone, permeable pavement and ancillary facilities in the process of sponge city construction. The reconstruction road was designed according to the 65% annual total runoff control rate, and the actual operation effect was monitored after the completion of the project. The results showed that the actual total runoff control rate reached 96.3%, and the runoff pollutant removal rate reached 79%. The design scheme could meet control target requirements of sponge city, and provide references for similar projects.
相似文獻(xiàn)/References:
[1]吳耀珊,計波,劉卓成.透水磚材料和下墊面對城市雨洪的影響[J].中國給水排水,2018,34(21):133.
WU Yao shan,JI Bo,LIU Zhuo cheng.Influence of Permeable Brick Material and Underlying Surface on Urban Stormwater[J].China Water & Wastewater,2018,34(20):133.
[2]湯忠,張亮,俞露,等.南方某濱海機(jī)場海綿建設(shè)策略探索[J].中國給水排水,2018,34(20):1.
TANG Zhong,ZHANG Liang,YU Lu,et al.Exploration on the Sponge Construction Strategies of a Coastal Airport in South China[J].China Water & Wastewater,2018,34(20):1.
[3]李勝海,陳思,白靜,等.山地城市市政道路低影響開發(fā)雨水系統(tǒng)設(shè)計與構(gòu)建[J].中國給水排水,2018,34(20):60.
LI Sheng hai,CHEN Si,BAI Jing,et al.Design and Construction of Stormwater Systems for Low-Impact-Development of Municipal Roads in Mountainous City[J].China Water & Wastewater,2018,34(20):60.
[4]許可,郭迎新,呂梅,等.對完善我國海綿城市規(guī)劃設(shè)計體系的思考[J].中國給水排水,2020,36(12):1.
XU Ke,GUO Ying-xin,Lü Mei,et al.Thinking on Improving Sponge City Planning and Design System in China[J].China Water & Wastewater,2020,36(20):1.
[5]楊文輝,張偉,張海行,等.常州海綿城市試點(diǎn)區(qū)建設(shè)中的閑置用地近遠(yuǎn)期管控[J].中國給水排水,2020,36(14):1.
YANG Wen-hui,ZHANG Wei,ZHANG Hai-xing,et al.Short-and Long-term Control of Idle Land in the Construction of Changzhou Sponge City Pilot Area[J].China Water & Wastewater,2020,36(20):1.
[6]聶超,周丹,林韻婕,等.建筑與小區(qū)低影響開發(fā)設(shè)計問題及對策[J].中國給水排水,2020,36(14):6.
NIE Chao,ZHOU Dan,LIN Yun-jie,et al.Design Problems and Countermeasures of Low Impact Development in Buildings and Communities[J].China Water & Wastewater,2020,36(20):6.
[7]張偉,王翔.基于海綿城市建設(shè)理念的慈城新城水安全系統(tǒng)構(gòu)建[J].中國給水排水,2020,36(14):12.
ZHANG Wei,WANG Xiang.Construction of Cicheng New Town Drainage Safety System Based on Sponge City Concept[J].China Water & Wastewater,2020,36(20):12.
[8]張凈,崔建軍,蔣禮兵,等.基于窄帶物聯(lián)網(wǎng)的海綿城市濾水養(yǎng)魚智能監(jiān)控系統(tǒng)設(shè)計[J].中國給水排水,2020,36(14):61.
ZHANG Jing,CUI Jian-jun,JIANG Li-bing,et al.Design of Intelligent Monitoring System for Fish Culture in Filtered Water of Sponge City Based on Narrow-band Internet of Things (NB-IoT)[J].China Water & Wastewater,2020,36(20):61.
[9]李國君,王永,梁振凱,等.海綿城市建設(shè)區(qū)域化效果評估探討[J].中國給水排水,2020,36(14):76.
LI Guo-jun,WANG Yong,LIANG Zhen-kai,et al.Evaluation of Regionalized Effect of Sponge City Construction[J].China Water & Wastewater,2020,36(20):76.
[10]方帥,徐潔,劉緒為,等.鎮(zhèn)江虹橋港上游黑臭水體系統(tǒng)性治理工程設(shè)計[J].中國給水排水,2020,36(14):94.
FANG Shuai,XU Jie,LIU Xu-wei,et al.Project Design of Systematic Treatment of Black-smelly Water Body in Upstream of Hongqiaogang, Zhenjiang City[J].China Water & Wastewater,2020,36(20):94.