南方某污水處理廠提標(biāo)改造后,排放標(biāo)準(zhǔn)從一級B提高至一級A標(biāo)準(zhǔn)和廣東省地標(biāo)兩者之嚴(yán)者?偟钡、總磷的排放值分別比原標(biāo)準(zhǔn)降低了25%、37.5%、50%,而該廠提標(biāo)后的主體工藝仍然為改良 AAO氧化溝,這對污水處理廠的運(yùn)行管理提出很大挑戰(zhàn)。通過污泥硝化速率分析,總氮、總磷成分檢測,精確加藥,跌水復(fù)氧分析及改造等措施優(yōu)化工藝運(yùn)行后,運(yùn)行效率明顯提升,在確保水質(zhì)穩(wěn)定達(dá)標(biāo)的同時,節(jié)約了生產(chǎn)成本,對同類污水處理廠的工藝優(yōu)化改造具有一定的參考意義。
Abstract:-
The discharge standard of a wastewater treatment plant after upgrading was raised from the national first level B to level A and the local standard of Guangdong Province. The new discharge limits on total nitrogen, ammonia nitrogen and total phosphorus, were 25%, 37.5% and 50% lower than those of the original standard. The main process was still AAO oxidation ditch after upgrading, which posed a great challenge to the operation and management. The process operation was optimized by analysis of sludge nitrification rate, total nitrogen and total phosphorus composition, accurate chemicals addition, fall re oxygenation, and etc.
相似文獻(xiàn)/References:
[1]熊建英.MBBR+磁混凝工藝用于污水處理廠提標(biāo)改造[J].中國給水排水,2018,34(20):50.
XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(8):50.
[2]盧如,巨志劍,杜瓊.采用A/O工藝的污水處理廠提標(biāo)改造工程設(shè)計[J].中國給水排水,2018,34(20):56.
LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(8):56.
[3]許曉明,劉宇心,閆萍,等.以工業(yè)廢水為主的污水廠準(zhǔn)Ⅳ類水質(zhì)提標(biāo)擴(kuò)建工程設(shè)計[J].中國給水排水,2020,36(18):60.
XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(8):60.
[4]聶健鋒,曾超.三峽庫區(qū)Carrousel氧化溝工藝提標(biāo)升級改造設(shè)計[J].中國給水排水,2020,36(18):66.
NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(8):66.
[5]張莉,余國富,瞿露,等.重慶市某污水處理廠一級A提標(biāo)改造運(yùn)行效果分析[J].中國給水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(8):95.
[6]馬麗芳,陳菊香,孫銳.克拉瑪依市某污水處理廠一級A提標(biāo)改造工程實例[J].中國給水排水,2020,36(18):122.
MA Li-fang,CHEN Ju-xiang,SUN Rui.A WWTP Upgrading Reconstruction Project to Meet the First Level A Discharge Standard in Karamay[J].China Water & Wastewater,2020,36(8):122.
[7]孫高升,王東東,弋凡,等.淮河流域地表水類Ⅳ類標(biāo)準(zhǔn)污水深度處理工藝研究[J].中國給水排水,2020,36(19):16.
SUN Gao-sheng,WANG Dong-dong,YI Fan,et al.Advanced Wastewater Treatment Process with Effluent Quality Meeting Level Quasi Ⅳ Criteria of Surface Water in Huai River Basin[J].China Water & Wastewater,2020,36(8):16.
[8]李亮,邱宏俊.改良A2/O氧化溝強(qiáng)化生化處理技術(shù)用于污水廠提標(biāo)改造[J].中國給水排水,2020,36(20):124.
LI Liang,QIU Hong-jun.Application of Improved A2/O Oxidation Ditch Enhanced Biochemical Treatment Process for Upgrading the Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(8):124.
[9]黃志心.城鎮(zhèn)污水處理廠提標(biāo)改造實踐與思考[J].中國給水排水,2020,36(22):48.
HUANG Zhi-xin.Practice and Thinking of Upgrading and Reconstruction of Municipal Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(8):48.
[10]白玉華,張欣宇,黃政鑫,等.AAOA-MBR強(qiáng)化脫氮工藝用于內(nèi)江市某污水廠提標(biāo)改造[J].中國給水排水,2020,36(24):87.
BAI Yu-hua,ZHANG Xin-yu,HUANG Zheng-xin,et al.AAOA-MBR Enhanced Denitrification Process for Upgrading and Reconstruction of a Wastewater Treatment Plant in Neijiang[J].China Water & Wastewater,2020,36(8):87.