ZHU Xin-jun,CAI Zhi-bin,YAO Bin,et al.Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):101-103.
紹興污水處理廠氣浮設(shè)備的優(yōu)化改造
- Title:
- Optimization and Modification of Air Floatation Equipment in Shaoxing Wastewater Treatment Plant
- Keywords:
- WWTP; air floating machine; modification
摘要:- 紹興污水處理廠氣浮機(jī)設(shè)備已運(yùn)行4年多,因水質(zhì)腐蝕和設(shè)備本身原因,氣浮設(shè)備不能穩(wěn)定運(yùn)行。為此提出了針對氣浮設(shè)備密封系統(tǒng)、氣浮機(jī)腐蝕、回流泵故障、加藥系統(tǒng)控制等問題的改造和應(yīng)對措施,改造后運(yùn)行結(jié)果表明,氣浮機(jī)運(yùn)行的穩(wěn)定性得到了提升,能夠保證該工藝單元的正常處理效果。
Abstract:- After operation for over four years, the air floatation equipment in Shaoxing Wastewater Treatment Plant cannot operate stably due to water quality corrosion and equipment itself. Therefore, the improvement and countermeasures for the sealing system of air floatation equipment, the corrosion of air floating machine, the failure of refluxing pump, the control of dosing system and other problems were put forward. The results showed that after implementation of the measures, the stability of the air floating machine was improved, which could ensure the normal treatment effect of the process unit.
相似文獻(xiàn)/References:
[1]王 亮.馬來西亞Pantai地埋式污水廠環(huán)網(wǎng)供配電結(jié)構(gòu)設(shè)計(jì)[J].中國給水排水,2018,34(22):63.
WANG Liang.Power Supply and Distribution Structure Design of Ring Network for Pantai Underground Wastewater Treatment Plantin Malaysia[J].China Water & Wastewater,2018,34(16):63.
[2]侯曉慶,鄧 磊,高海英,等.MBR工藝在神定河污水處理廠升級改造工程中的應(yīng)用[J].中國給水排水,2018,34(22):66.
HOU Xiao-qing,DENG Lei,GAO Hai-ying,et al.Application of MBR Process in the Upgrading and Reconstruction Project of Shending River WastewaterTreatment Plant[J].China Water & Wastewater,2018,34(16):66.
[3]邱明海.北京市垡頭污水處理廠改擴(kuò)建工程設(shè)計(jì)技術(shù)方案[J].中國給水排水,2018,34(20):13.
QIU Ming hai.Reconstruction and Expansion Design Technical Plan of Beijing Fatou Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(16):13.
[4]郝二成,郭毅,劉偉巖,等.基于數(shù)學(xué)模擬的污水廠運(yùn)行分析——建模與體檢[J].中國給水排水,2020,36(15):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Modeling and Examination[J].China Water & Wastewater,2020,36(16):23.
[5]張?jiān)?王陽,張宏偉,等.陽泉市污水處理二期工程BARDENPHO工藝設(shè)計(jì)和運(yùn)行[J].中國給水排水,2020,36(16):64.
ZHANG Yue,WANG Yang,ZHANG Hong-wei,et al.Design and Operation of BARDENPHO Process in Phase Ⅱ Project of Yangquan Wastewater Treatment Plant[J].China Water & Wastewater,2020,36(16):64.
[6]王文明,楊淇椋,蔡依廷,等.MSBR工藝在高排放標(biāo)準(zhǔn)污水處理廠的應(yīng)用[J].中國給水排水,2020,36(16):111.
WANG Wen-ming,YANG Qi-liang,CAI Yi-ting,et al.Application of MSBR Process in Wastewater Treatment Plant with Stringent Discharge Standard[J].China Water & Wastewater,2020,36(16):111.
[7]郝二成,郭毅,劉偉巖,等.基于數(shù)學(xué)模擬的污水廠運(yùn)行分析——控制與優(yōu)化[J].中國給水排水,2020,36(17):23.
HAO Er-cheng,GUO Yi,LIU Wei-yan,et al.Operation Analysis of Wastewater Treatment Plant Based on Mathematical Simulation: Control and Optimization[J].China Water & Wastewater,2020,36(16):23.
[8]王陽,張?jiān)?王曉康,等.高排放標(biāo)準(zhǔn)下的改良AAO+深度處理工程案例[J].中國給水排水,2020,36(18):56.
WANG Yang,ZHANG Yue,WANG Xiao-kang,et al.Project Case of Modified AAO and Advanced Treatment Process under High Emission Standards[J].China Water & Wastewater,2020,36(16):56.
[9]鄭楓,慕楊,孫遜.MBR工藝用于山東省某污水處理廠擴(kuò)建工程[J].中國給水排水,2020,36(18):81.
ZHENG Feng,MU Yang,SUN Xun.MBR Process Used in Expansion Project of a Sewage Treatment Plant in Shandong Province[J].China Water & Wastewater,2020,36(16):81.
[10]張莉,余國富,瞿露,等.重慶市某污水處理廠一級A提標(biāo)改造運(yùn)行效果分析[J].中國給水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(16):95.