LU Ru,JU Zhi jian,DU Qiong.Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process[J].China Water & Wastewater,2018,34(20):56-59.
采用A/O工藝的污水處理廠提標(biāo)改造工程設(shè)計
- Title:
- Upgrading and Reconstruction Project Design of Wastewater Treatment Plant with A/O Process
- 文章編號:
- 1000-4602(2018)20-0056-04
- 關(guān)鍵詞:
- 污水處理; 提標(biāo)改造; A/O工藝
分類號:- TU992.3
文獻標(biāo)志碼:- C
摘要:- 遼寧省某污水處理廠設(shè)計規(guī)模為10×104 m3/d,采用A/O處理工藝。升級改造工程要求設(shè)計出水水質(zhì)從《城鎮(zhèn)污水處理廠污染物排
放標(biāo)準(zhǔn)》(GB 18918—2002)一級B標(biāo)準(zhǔn)提升至一級A標(biāo)準(zhǔn)。針對出水總氮超標(biāo)問題,增設(shè)一組A/O生化池,以降低脫氮負荷,同時增設(shè)碳源投加系統(tǒng),從而保證了脫氮效率;針對進水含砂量大,導(dǎo)致粗、細格柵和提升水泵等機械設(shè)備磨損嚴(yán)重的問題,提標(biāo)改造中增設(shè)了粗格柵及平流沉砂池,使進水中的砂在平流沉砂池內(nèi)預(yù)沉,同時去除大顆粒漂浮物,從而保證了粗、細格柵及提升泵的正常運行。實際運行表明,提標(biāo)改造工程出水水質(zhì)完全達到一級A標(biāo)準(zhǔn)。
Abstract:- A/O process was adopted in a wastewater treatment plant with capacity of 10×104 m3/d in Liaoning Province. The effluent quality of reconstruction project was required to be upgraded from the first level B standard to the first level A criteria specified in the Discharge Standard of Pollutants for Municipal Wastewater Treatment Plant (GB 18918-2002). Denitrifying load would be lowered by construction of a new A/O biochemical tank, and nitrogen removal efficiency would be ensured by supplement of carbon source. The inlet water contained a lot of grit which led to serious wear of mechanical equipment such as coarse screen, fine rack and lift pumps. The grit and large particles of floatation in water would be settled by usage of the coarse screen and the horizontal flow grid chamber. As a result, the coarse screen, fine rack and lift pumps would operate normally. Actual operation showed the effluent quality could meet the first level A standard.
參考文獻/References:
[1]周雹. 活性污泥工藝簡明原理及設(shè)計計算[M]. 北京:中國建筑工業(yè)出版社,2005.Zhou Bao. Simple Principle and Design Calculation of Activated Sludge Process[M]. Beijing:China Architecture & Building Press,2005(in Chinese).
[2]周丹,周雹. 污水脫氮工藝中外部碳源投加量簡易計算方法[J]. 給水排水,2011,37(11):38-41.Zhou Dan,Zhou Bao. Simple calculation method for the outside carbon source dosage for nitrogen removal process in wastewater treatment[J]. Water & Wastewater Engineering,2011,37(11):38-41(in Chinese).
[3]孫淑琴,常華,李建科,等. 水廠改造工程設(shè)計與運行案例分析[J]. 凈水技術(shù),2013,32(4):90-95.Sun Shuqin,Chang Hua,Li Jianke,et al. Case analysis of design and operation for rehabilitation project of water treatment plant[J]. Water Purification Technology,2013,32(4):90-95(in Chinese).
相似文獻/References:
[1]張瑩,王昌穩(wěn),李軍,等.投加微粉強化低濃度生活污水活性污泥好氧顆;痆J].中國給水排水,2018,34(21):12.
ZHANG Ying,WANG Chang wen,LI Jun,et al.Strengthening Aerobic Granulation of Activated Sludge by Adding Micro Powder in Low Concentration Sewage Treatment[J].China Water & Wastewater,2018,34(20):12.
[2]熊建英.MBBR+磁混凝工藝用于污水處理廠提標(biāo)改造[J].中國給水排水,2018,34(20):50.
XIONG Jian ying.Application of MBBR + Magnetic Coagulation Process for Upgrading of Wastewater Treatment Plant[J].China Water & Wastewater,2018,34(20):50.
[3]王連杰,李金河,鄭興燦,等.城鎮(zhèn)污水系統(tǒng)中病毒特性和規(guī)律相關(guān)研究分析[J].中國給水排水,2020,36(6):14.
[4]周亞梁,黃東月.南方某污水處理廠提標(biāo)改造工藝運行優(yōu)化[J].中國給水排水,2020,36(8):113.
[5]顧玉中,黃學(xué)軍,金秋景,等.污水處理廠軸流泵電流爬升的原因及解決方法[J].中國給水排水,2020,36(10):119.
[6]王凱,高波,張磊,等.危廢處置中心污水分質(zhì)處理工藝設(shè)計及運行經(jīng)驗[J].中國給水排水,2020,36(16):69.
WANG Kai,GAO Bo,ZHANG Lei,et al.Experience in Design and Operation of Wastewater Separate Treatment in the Hazardous Waste Disposal Center[J].China Water & Wastewater,2020,36(20):69.
[7]李爽,王向陽,郝曉地,等.全生命周期評價在污水處理中的研究與應(yīng)用[J].中國給水排水,2020,36(18):32.
LI Shuang,WANG Xiang-yang,HAO Xiao-di,et al.Research and Application of Life Cycle Assessment in Wastewater Treatment[J].China Water & Wastewater,2020,36(20):32.
[8]許曉明,劉宇心,閆萍,等.以工業(yè)廢水為主的污水廠準(zhǔn)Ⅳ類水質(zhì)提標(biāo)擴建工程設(shè)計[J].中國給水排水,2020,36(18):60.
XU Xiao-ming,LIU Yu xin,YAN Ping,et al.A Design Case of Upgrading and Expansion Project to Meet the Quasi-Ⅳ Class Standard in a WWTP with Industrial Wastewater as Its Major Influent[J].China Water & Wastewater,2020,36(20):60.
[9]聶健鋒,曾超.三峽庫區(qū)Carrousel氧化溝工藝提標(biāo)升級改造設(shè)計[J].中國給水排水,2020,36(18):66.
NIE Jian-feng,ZENG Chao.Design of Upgrading and Reconstruction of Carrousel Oxidation Ditch Process in Three Gorges Reservoir Area[J].China Water & Wastewater,2020,36(20):66.
[10]張莉,余國富,瞿露,等.重慶市某污水處理廠一級A提標(biāo)改造運行效果分析[J].中國給水排水,2020,36(18):95.
ZHANG Li,YU Guo-fu,QU Lu,et al.Analysis on the Operation Effect of a WWTP Upgrading Project for the Firstlevel A Standard in Chongqing[J].China Water & Wastewater,2020,36(20):95.
[11]張岳,葛銅崗,孫永利,等.基于城鎮(zhèn)污水處理全流程環(huán)節(jié)的碳排放模型研究[J].中國給水排水,2021,37(9):65.
ZHANG Yue,GE Tong-gang,SUN Yong-li,et al.Research on Carbon Emission Model Based on the Whole Process of Urban Sewage Treatment[J].China Water & Wastewater,2021,37(20):65.
備注/Memo
作者簡介:盧如(1987-),女,江西豐城人,碩士,工程師,主要從事市政給排水處理研究。
E-mail:303632669@qq.com
收稿日期:2018-04-18